Project Description

SoCal Gas; NV Energy; BrightSource Energy; Silver State Solar

Enforced a Stormwater Pollution and Prevention Plan (SWPPP) that address controlling construction-related erosion and sedimentation.

Constructed and installed all BMPs outlined in the SWPPP to limit sediment movement. Flow dissipation and sediment control structures were also constructed in appropriate locations. Small weed-free hay bale dams were placed below slopes as temporary erosion control measures.

Ensured that fueling of equipment did not occur adjacent to or in drainages. “No-fueling zones” were designated on construction maps and a minimum of 50 feet (15 meters) from drainages

Project Details

CLIENTS

SoCal Gas
NV Energy
BrightSource Energy
Silver State Solar

PROJECT TYPE

Clean Water Permitting

Get A Quote Today

Have a project in mind? Send us an email for a free quote!

    FIRST NAME *

    LAST NAME *

    EMAIL ADDRESS *

    PHONE NUMBER

    SUBJECT

    HOW CAN WE HELP?