Project Description
SoCal Gas; NV Energy; BrightSource Energy; Silver State Solar
Enforced a Stormwater Pollution and Prevention Plan (SWPPP) that address controlling construction-related erosion and sedimentation.
Constructed and installed all BMPs outlined in the SWPPP to limit sediment movement. Flow dissipation and sediment control structures were also constructed in appropriate locations. Small weed-free hay bale dams were placed below slopes as temporary erosion control measures.
Ensured that fueling of equipment did not occur adjacent to or in drainages. “No-fueling zones” were designated on construction maps and a minimum of 50 feet (15 meters) from drainages
Project Details
CLIENTS
SoCal Gas
NV Energy
BrightSource Energy
Silver State Solar
PROJECT TYPE
Clean Water Permitting
Get A Quote Today
Have a project in mind? Send us an email for a free quote!